# Production draft: Shelving, oak industrial

**Status:** Draft, made by rules in seconds. Nothing is measured on site, drawn by a designer or checked by an engineer; sizes come from room from the sentence.
**Prices:** From Demo shop (illustrative prices and lead times, not quotes), as imported 2026-11-17. The shop's rates are its own settings, not market rates.
**Brief:** "Industrial bookshelf 2.4m long, black steel frame with oak shelves"

## What it is

3 units on 1 wall: 3 × steel frame shelving.

## Assumed

- Ceiling height assumed 2600 mm.

## Materials

Chosen: **Balanced**. The best balance of the brief's priorities: $1,883, 9 days, 100% of materials from stock.

| Plan | Price | Days | From stock | Fit |
|---|---|---|---|---|
| Balanced ✓ | $1,883 | 9 | 100% | 95% |
| Lowest cost (same as Balanced) | $1,883 | 9 | 100% | 95% |
| Fastest (same as Balanced) | $1,883 | 9 | 100% | 95% |
| Most from stock (same as Balanced) | $1,883 | 9 | 100% | 95% |

| Used for | Material | Qty | From stock | To buy | Lead | Cost |
|---|---|---|---|---|---|---|
| frame | Steel square tube 30x30x1.5 6000mm (STL30-SHS) | 10 bar | 10 | – | in stock | $180 |
| front | MFC 18mm natural oak 2800x2070 (MFC18-OAK) | 1 sheet | 1 | – | in stock | $58 |
| edge-front | ABS edge band 1mm natural oak 22mm 100m (EB1-OAK) | 0.4 roll | 0.4 | – | in stock | $14 |
| leg | Levelling foot M8 (LEG-FOOT) | 12 each | 12 | – | in stock | $5 |
| connector | Shelf screw 4x16 (CON-SS) | 60 each | 60 | – | in stock | $1 |

## Cutting

- MFC18-OAK: 1 board, 73% average use
- Remnants to keep: MFC18-OAK 634 × 368; MFC18-OAK 368 × 350; MFC18-OAK 368 × 350

## Hardware and metal

| | Item | Qty | From stock | To buy | Used in |
|---|---|---|---|---|---|
| Fixings | Shelf screw 4x16 (CON-SS) | 60 each | 60 | – | At01 ×20 At02 ×20 At03 ×20 |
| Legs and feet | Levelling foot M8 (LEG-FOOT) | 12 each | 12 | – | At01 ×4 At02 ×4 At03 ×4 |
| Metal frame | Steel square tube 30x30x1.5 6000mm (STL30-SHS) | 10 bar | 10 | – | At01 ×24 At02 ×24 At03 ×24 |

Bars are cut as listed in metal-cutlist.csv: 10 bars, 72 pieces.

## Hours and price

- Cut 15 parts from 1 boards: 0.28 h (saw)
- Edge 60 edges: 0.4 h (edge bander)
- Assemble 3 units, 0 drawers, hang 0 doors: 1.5 h
- Cut 72 tubes and weld 3 frames: 5.4 h (welder)
- Pack 3 units: 0.5 h
- Install 3 units and 0 worktops: 3.6 h

Materials $258, labour $526, machines $182, bought-in work $180, overhead $172, margin $565: **$1,883**.

## Schedule

9 days: materials 0, shop 3, finishing 5, fitting 1. Longest: 5 days powder coating; 3 days in the shop.

## Check before approving

- Frames are welded and powder coated; powder coating is bought in.

## What isn't done

- No site survey: every size is from the sentence or the plan given.
- Appliances, sinks and taps are the client's; their cut-outs follow their templates.
- Joinery, drilling patterns and hardware positions follow the shop's standard; nothing is checked against a real fitting's datasheet.
- The Design and Engineering steps make the drawings a fitter works from; this is a draft to price and plan with.