# Production draft: TV unit, walnut

**Status:** Draft, made by rules in seconds. Nothing is measured on site, drawn by a designer or checked by an engineer; sizes come from room from the sentence.
**Prices:** From Demo shop (illustrative prices and lead times, not quotes), as imported 2026-11-17. The shop's rates are its own settings, not market rates.
**Brief:** "TV unit 2.4m walnut veneer, wall-hung, soft-close"

## What it is

3 units on 1 wall: 3 × low unit.

## Assumed

- Ceiling height assumed 2600 mm.

## Materials

Chosen: **Balanced**. The best balance of the brief's priorities: $1,909, 37 days, 31% of materials from stock.

| Plan | Price | Days | From stock | Fit |
|---|---|---|---|---|
| Balanced ✓ | $1,909 | 37 | 31% | 96% |
| Lowest cost | $2,133 | 37 | 23% | 96% |
| Fastest (same as Balanced) | $1,909 | 37 | 31% | 96% |
| Most from stock (same as Balanced) | $1,909 | 37 | 31% | 96% |

| Used for | Material | Qty | From stock | To buy | Lead | Cost |
|---|---|---|---|---|---|---|
| front | Walnut veneered MDF 19mm 2440x1220 (VEN19-WAL) | 2 sheet | 0 | 2 | 28 d | $370 |
| carcass, drawer-box | MFC 18mm white 2800x2070 (MFC18-WH) | 1 sheet | 1 | – | in stock | $73 |
| slide | Undermount slide soft-close 350mm (pair) (SLD-UM-350) | 3 pair | 3 | – | in stock | $72 |
| finish | Clear lacquer matt (LAC-MATT) | 1.1 l | 1.1 | – | in stock | $20 |
| handle | Bar handle 320mm stainless (HDL-320-SS) | 3 each | 3 | – | in stock | $15 |
| edge-front | Walnut veneer edge band 22mm 50m (EBV-WAL) | 0.27 roll | 0 | 1 | 21 d | $15 |
| back | HDF 3mm white 2800x2070 back panel (HDF3-WH) | 1 sheet | 1 | – | in stock | $14 |
| connector | Wall hanging bracket (CON-WB) | 6 each | 6 | – | in stock | $11 |
| connector | Confirmat screw 7x50 (CON-CONF) | 48 each | 48 | – | in stock | $2 |
| edge-carcass | ABS edge band 1mm white 22mm 200m (EB1-WH) | 0.07 roll | 0.07 | – | in stock | $2 |
| connector | Panel connector (CON-PNL) | 8 each | 8 | – | in stock | $1 |

## Cutting

- MFC18-WH: 5 boards (4 from remnants), 65% average use
- VEN19-WAL: 2 boards, 40% average use
- HDF3-WH: 1 board, 32% average use
- Remnants to keep: MFC18-WH 2102 × 2050; VEN19-WAL 796 × 400; VEN19-WAL 764 × 392; VEN19-WAL 447 × 399; VEN19-WAL 1200 × 1198; VEN19-WAL 776 × 450; VEN19-WAL 764 × 372; HDF3-WH 1880 × 1696; and 2 more

## Hardware and metal

| | Item | Qty | From stock | To buy | Used in |
|---|---|---|---|---|---|
| Drawer slides | Undermount slide soft-close 350mm (pair) (SLD-UM-350) | 3 pair | 3 | – | Ab01 ×1 Ab02 ×1 Ab03 ×1 |
| Fixings | Confirmat screw 7x50 (CON-CONF) | 48 each | 48 | – | Ab01 ×16 Ab02 ×16 Ab03 ×16 |
| Fixings | Panel connector (CON-PNL) | 8 each | 8 | – | Ab01 ×4 Ab03 ×4 |
| Fixings | Wall hanging bracket (CON-WB) | 6 each | 6 | – | Ab01 ×2 Ab02 ×2 Ab03 ×2 |
| Handles | Bar handle 320mm stainless (HDL-320-SS) | 3 each | 3 | – | Ab01 ×1 Ab02 ×1 Ab03 ×1 |

## Drilling

152 holes in 29 parts, 7 drilling patterns (drawings/drilling.svg). Every hole, with its face, position, diameter and depth, is in drilling.csv; the cutting DXF carries them on one layer per tool.

- confirmat: 48
- confirmat edge: 48
- slide fixing: 12
- slide: 12
- hanging bracket: 12
- panel connector: 8
- handle: 6
- front fixing: 6

## Hours and price

- Cut 35 parts from 8 boards: 1.42 h (saw)
- Edge 40 edges: 0.27 h (edge bander)
- Drill 152 holes in 29 parts: 0.39 h (CNC)
- Assemble 3 units, 3 drawers, hang 0 doors: 2.1 h
- Lacquer 5.0 m²: 1.77 h (spray booth)
- Pack 3 units: 0.5 h
- Install 3 units and 0 worktops: 3.6 h

Materials $594, labour $452, machines $116, overhead $174, margin $573: **$1,909**.

## Schedule

37 days: materials 28, shop 3, finishing 5, fitting 1. Longest: waiting 28 days for Walnut veneered MDF 19mm 2440x1220; 5 days painting and drying.

## What isn't done

- No site survey: every size is from the sentence or the plan given.
- Appliances, sinks and taps are the client's; their cut-outs follow their templates.
- Joinery, drilling patterns and hardware positions follow the shop's standard; nothing is checked against a real fitting's datasheet.
- The Design and Engineering steps make the drawings a fitter works from; this is a draft to price and plan with.